Home / News, Stories and Upcoming Events / The SCNM Voice / SCNM Campus Expansion - Concrete Work

SCNM Campus Expansion - Concrete Work

5/28/2014

More windows are being installed throughout the building:

ConcreteWork1

On the west side of the building, the construction crews are laying down a handicap ramp:

The construction crews continued to work on the stairs for the lobby:

Once they were done with the metalwork, they proceeded to fill the stairs. The crews had to thread the concrete pipe through the second floor window. As the concrete was poured down the stairs, workers filled out the empty gaps manually.

ConcreteWork4

The construction crews also poured concrete on the first floor. Wonder how concrete is so smooth? As the crew spreads the poured concrete evenly with shovels, one of the workers "floats" the concrete with special equipment:

ConcreteWork5

For final touches, a worker goes over the dried concrete to make sure it is completely smooth.

ConcreteWork6

Stay tuned for more updates!