The elevator installation took a couple weeks to complete, which isn't surprising when you see the pictures of the process!

Here are the boxes that contained all the parts:

 alt=

They installed the platform and the elevator cable:

elevator2

Then they started putting in the metal frame and wiring: 

elevator3

elevator4

And here is the final product! On the right, electricians (separate from the elevator installers) came in to connect the outlet and wiring for the elevator.

elevator5

elevator6

The construction crews also worked on the upper roof of the entrance canopy:

 alt=

And took great care in spraying clean the metal frames on the outside of the building.